HoHoSkips APK

HoHoSkips  Icon
0/5
0 Ratings
Developer
Environmental Protection Department, HKSARG
Current Version
2.1
Date Published
File Size
200.7 MB
Package ID
hk.gov.epd.hohoskips
Price
$ 0.00
Downloads
1.6K+
Category
Android Apps
Genre
Productivity

APK Version History

Version
2.1 (11)
Architecture
arm64-v8a,armeabi-v7a,x86,x86_64
Release Date
May 21, 2023
Requirement
Android 7.0+
Version
2.0 (9)
Architecture
arm64-v8a,armeabi-v7a,x86,x86_64
Release Date
May 15, 2023
Requirement
Android 7.0+
Version
1.0.2 (6)
Architecture
arm64-v8a,armeabi-v7a,x86_64
Release Date
May 15, 2023
Requirement
Android 7.0+
  • HoHoSkips Screenshot
  • HoHoSkips Screenshot
  • HoHoSkips Screenshot
  • HoHoSkips Screenshot
  • HoHoSkips Screenshot
  • HoHoSkips Screenshot
  • HoHoSkips Screenshot
  • HoHoSkips Screenshot
  • HoHoSkips Screenshot
  • HoHoSkips Screenshot
  • HoHoSkips Screenshot
  • HoHoSkips Screenshot
  • HoHoSkips Screenshot
  • HoHoSkips Screenshot
  • HoHoSkips Screenshot
  • HoHoSkips Screenshot
  • HoHoSkips Screenshot
  • HoHoSkips Screenshot

About Radio FM 90s

HoHoSkips assist citizens and renovation workers in properly disposing of small quantity of construction waste. It provides appointment services, real-time location of collection vehicles, tools for communicating with waste collection personnel, etc. To use the service of HoHoSkips, you can firstly separate your construction waste into inert and non-inert waste. Then, make an appointment and meet our driver at the designated collection point. Finally, place the waste to the weighing scale and make the payment to complete the transaction.
When making an appointment, please note that each service only accepts construction waste no more than half the volume of a skip (about 20 bags or about 1 tonne). Construction waste must be correctly separated into inert and non-inert in advance. Fragmented construction waste must be well-packed in bags, and arrive at the scheduled collection point on time. Each premises can only use the service three times a month. The contract price of the project for the waste-generating site must be less than HKD 1 million. Otherwise, the contractor must open a billing account for using government‘s waste disposal facilities and handle construction waste on its own as required by law.

What's New in this version

- Added English and Simplified Language Chinese version