Omega Linkr 2.71.0 APK

Omega Linkr 2.71.0 Icon
  
3.13/5
14 Ratings
Developer
Omega Research & Development Technologies, Inc.
Current Version
2.71.0
Date Published
File Size
73.0 MB
Package ID
com.falcon.carlinksmsproject
Price
$ 0.00
Downloads
1.6K+
Category
Android Apps
Genre
Lifestyle

APK Version History

Version
2.71.0 (35)
Architecture
arm64-v8a,armeabi-v7a,x86,x86_64
Release Date
May 21, 2019
Requirement
Android 4.3+
Version
2.70.0 (33)
Architecture
arm64-v8a,armeabi-v7a,x86,x86_64
Release Date
May 21, 2019
Requirement
Android 4.3+
Version
2.67.0 (30)
Architecture
arm64-v8a,armeabi-v7a,mips,x86,x86_64
Release Date
May 21, 2019
Requirement
Android 4.3+
Version
2.36.0 (21)
Architecture
arm64-v8a,armeabi-v7a,mips,x86
Release Date
May 21, 2019
Requirement
Android 4.3+
Version
2.30.0 (19)
Architecture
arm64-v8a,armeabi-v7a,mips,x86
Release Date
May 21, 2019
Requirement
Android 4.3+
  • Omega Linkr Screenshot
  • Omega Linkr Screenshot
  • Omega Linkr Screenshot
  • Omega Linkr Screenshot
  • Omega Linkr Screenshot
  • Omega Linkr Screenshot
  • Omega Linkr Screenshot

About Radio FM 90s

Linkr allows you to start, lock, unlock, activate trunk release, track, and more directly from your phone!

NOTE: An Omega Linkr system must be installed in your vehicle for this app to operate.
NOTE: Locations are sent by SMS message with a link to Google Maps.

Models:
LINKR-MOBILE-2G is an international (outside the USA) system that works on any GSM cellular network with a user supplied SIM card.
LINKR-M1 uses the Verizon network in the USA. Activations & subscriptions are available at www.OmegaLinkr.com.

Omega Linkr is a smartphone interface that gives you control of vehicle convenience & security features from virtually anywhere in the world! This app can directly control Omega's Excalibur line of remote start/security systems & Omegalink vehicle specific remote start kits. It can also be hardwired directly to the vehicle.

Omega Linkr allows you to safely and securely remote start, lock / unlock, or open your car's trunk from virtually anywhere in the world.
Receive alerts and notifications if your vehicle is violated when installed with any compatible remote start / security system.

Main Features:
- Multi-user support
- Multi-device support
- Easy swipe between devices
- 6 languages supported: English, Spanish, French, Malay, Romanian, Serbian
- Heartbeat / Auto-track from once per 1-30 days
- Excessive speed alert w/ selectable threshold
- Low car battery alert
- 2 selectable Geo-fences w/ alerts
- Selectable device icon
- Selectable control screen skin
- Panic from button in car or from app
- Check SIM balance (outside the USA only)
- Eaves drop feature allows you to listen to the vehicle's interior (outside USA only).
Optional LINKR-MIC required.
- Lock control
- Unlock control
- Trunk release
- Start / Stop Engine (optional remote start system required)
- 2 Auxiliary functions
- Dedicated starter disable function
- Assign up to 5 alert receivers

What's New in this version

Fixed issue with SMS command when app is force closed.